Meeting

The Superintending Engineering Coimbatore Electricity Distribution Circle (North) will conduct a grievances redress meeting at Mettupalayam Division Office at 11 a.m. on July 18.

Power shutdown

In view of the proposed maintenance works to be undertaken at the Kurichi sub-station on
July 19
from 9 a.m. to 4 p.m., there will be no power supply in the following areas: Sidco, Podanur, Kurichi, Housing Unit, Malumichampatty – I part, Sundarapuram, Eachanary and L.I.C. Colony

Arasur sub-station:
Arasur, Pothiyampalayam, Kurumbapalayam, Thennam palayam, Sengoda goundenpudur, Sellappam palayam, Pachapalayam, Vaduga palayam, Sangothi palayam, Samathuva puram, Anbu Nagar, Annur Road, Ponnan dampalayam and Molapalayam.

Assistance given

The UPS and the stabilizer manufacturers of Coimbatore jointly organised a function in which free mobility equipment, including artificial limbs, walking sticks, rollers and wheel chairs were distributed to the physically challenged people by Collector Hariharan.

Source: Read Full Article